Road Projects Completed By RAPCO
|
Sr.No. |
Name of Employer |
Name, Location and type of Project |
Name of (Consulting) Engineer responsible for Supervision |
Contract Price & Date |
Percentage of Participation of company in project |
was contract Satisfactorily completed to cost, quality & time provision |
1 |
ADM,Abu Dhabi, UAE |
Sector E-15 Internal Sector Road, Including Services |
Conser Consulting Engineers, Abu Dhabi, UAE |
21,014,000.00
12-Jan-79 |
100% |
Yes On Time |
2 |
Abu Dhabi Defence Force, Abu Dhabi |
Contract No. WMR/379 Surfacing & Resurfacing of Military Parade Ground Sweihan |
Co. Engg. Corps.,Abu Dhabi, UAE |
5,000,000.00
5-Jan-79 |
100% |
Yes On Time |
3 |
ADM,Abu Dhabi, UAE |
Sector E-20/02 Internal Sector Road, Including Services |
Chief Engineer Town Roads, Abu Dhabi |
3,000,000.00
12-Oct-78 |
100% |
Yes On Time |
4 |
ADM,Abu Dhabi, UAE |
Sector E-3 Internal Sector Road, Including Services |
Conser Consulting Engineers, Abu Dhabi, UAE |
38,400,000.00
21-Oct-81 |
100% |
Yes On Time |
5 |
Public Works Department P.O.Box 3, Abu Dhabi |
Police Training School Internal Roads (Sub-Contract) |
Syrian Consult, Abu Dhabi |
4,000,000.00
1979 |
100% |
Yes On Time |
6 |
ADM,Abu Dhabi, UAE |
Trip Project 6 Improvement of Intersection & Widening of Main Airport Road |
De Leuw Cather International, Abu Dhabi |
74,286,227.00
5-May-84 |
100% |
Yes On Time |
7 |
Department of Electricity & Water, Abu Dhabi, UAE |
5 Nos. Tawil Al Faqa Samhah Pipe Line in Abu Dhabi Construction of Concrete Foundation of Tanks Concrete, Access Road |
Tebodin Middle East, Abu Dhabi, UAE |
4,000,000.00 1980 |
100% |
Yes On Time |
8 |
Abu Dhabi Defence, Abu Dhabi |
Contract No. EC/569 Defence Ordance Dept (Store) Zone "E" Internal Roads Network to Ext. Ammtn Store |
Co. Engg. Corps.,Abu Dhabi, UAE |
27,000,000.00 11-Jun-82 |
100% |
Yes On Time |
9 |
Abu Dhabi Defence, Abu Dhabi |
Contract No. EC/566 Asphalt Road Earthworks Footpath, etc |
Co. Engg. Corps.,Abu Dhabi, UAE |
46,000,000.00 13-Apr-82 |
100% |
Yes On Time |
10 |
Abu Dhabi Defence, Abu Dhabi |
Contract No. EC/585 Perimeter Fence to Danger Zone, Approach Road & Water Supply Line |
Co. Engg. Corps.,Abu Dhabi, UAE |
6,400,000.00 13-Aug-82 |
100% |
Yes On Time |
11 |
ADM,Abu Dhabi, UAE |
Sector W-48 Internal Sector Road including Services, Abu Dhabi |
Spectrum Engineering Consultant, Abu Dhabi, UAE |
35,383,000.00 12-Oct-83 |
100% |
Yes On Time |
12 |
Abu Dhabi Defence, Abu Dhabi |
3A Airforce Base Asphalt Works |
Co. Engg. Corps.,Abu Dhabi, UAE |
4,700,000.00 1981 |
100% |
Yes On Time |
13 |
ADM,Abu Dhabi, UAE |
Trip Project 21M Improvement of Intersection & Widening of Zayed 1st & 2nd Streets |
De Leuw Cather International, Abu Dhabi |
127,949,463.00 25-Mar-86 |
100% |
Yes On Time |
14 |
ADM,Abu Dhabi, UAE |
Sector W47 Internal Sector Roads including Services |
Dr. Ing. Walter & Partners Consulting Engineers, Abu Dhabi |
37,961,747.00 3-Aug-84 |
100% |
Yes On Time |
15 |
Al Ain Municipality, Al Ain, UAE |
Stage II, Section 2 - Al Ain Town Roads including Services, Al Ain |
Spectrum Engineering Consultant, Abu Dhabi, UAE |
41,871,620.00 2-Feb-85 |
100% |
Yes On Time |
16 |
Al Ain Municipality, Al Ain, UAE |
Al Fursan & Al Gazlan Roads, Al Ain |
Conser Consulting Engineers, Al Ain, UAE |
28,548,565.00 3-Apr-86 |
100% |
Yes On Time |
17 |
Abu Dhabi Municipality, Abu Dhabi, UAE |
Trip Project 19 IP-1 Interchange, Underpass at Roundabout, Airport Road, Abu Dhabi |
De Leuw Cather International, Abu Dhabi |
63,568,000.00 31-Dec-85 |
100% |
Yes On Time |
18 |
ADM,Abu Dhabi, UAE |
Diwan Al Amri at Ras Al Akhdar (OLD) |
ADM,Abu Dhabi, UAE |
9,787,509.00 31-Jan-85 |
100% |
Yes On Time |
19 |
Al Ain Municipality, Al Ain, UAE |
Service Road for palaces & University Farm at Al Ain |
Freeman Fox International Ltd, Abu Dhabi |
3,997,350.00 Sep-85 |
100% |
Yes On Time |
20 |
ADM,Abu Dhabi, UAE |
Sector Roads W46/01,02 W52/3 Surface Water Drainage, Abu Dhabi |
Arab Office for Planning, Abu Dhabi |
6,902,000.00 15-Nov-85 |
100% |
Yes On Time |
21 |
Al Ain Municipality, Al Ain, UAE |
Sheikh Mubarak Palace Road, Al Ain |
Freeman Fox International Ltd, Abu Dhabi |
7,972,303.00 20-Nov-85 |
100% |
Yes On Time |
22 |
ADM,Abu Dhabi, UAE |
Diwan Al Amri at Ras Al Akhdar (New) |
ADM,Abu Dhabi, UAE |
5,669,000.00 24-Oct-86 |
100% |
Yes On Time |
23 |
Al Ain Municipality, Al Ain, UAE |
Stage 3 - Repairing & Resurfacing Roads in Al Gimi & Al Quatara, Al Ain |
Italconsult, Abu Dhabi |
21,090,000.00 24-Oct-86 |
100% |
Yes On Time |
24 |
ADM,Abu Dhabi, UAE |
Trip Project 76S (JV Pauling (M.E)/ RAPCO) Airport Road/ East Road |
De Leuw Cather International, Abu Dhabi |
129,842,000.00 1-Dec-86 |
100% |
Yes On Time |
25 |
ADM,Abu Dhabi, UAE |
Sector Road W47, Surface Water Drainage, Abu Dhabi |
Dr. Ing. Walter & Partners Consulting Engineers, Abu Dhabi |
12,769,000.00 30-Apr-87 |
100% |
Yes On Time |
26 |
Al Ain Municipality, Al Ain, UAE |
Shwaib Al Madam Road Repairs, Al Ain |
Freeman Fox International Ltd, Abu Dhabi |
7,295,084.00 16-Jan-88 |
100% |
Yes On Time |
27 |
Al Ain Municipality, Al Ain, UAE |
Roads & Parking in H.H. Sh. Zayed Al Maqam Palace & H.H.Sh.Khalifa Palace, Al Ain |
Italconsult, Abu Dhabi |
14,258,258.00 3-Dec-88 |
100% |
Yes On Time |
28 |
ADM,Abu Dhabi, UAE |
Access Road to Al Gurf Palaces Off Abu Dhabi-Dubai Road, Abu Dhabi |
Chief Engineer Town Roads, Abu Dhabi |
34,194,550.00 2-Jan-90 |
100% |
Yes On Time |
29 |
ADM,Abu Dhabi, UAE |
Access Road to Al Ajban Palaces Off Abu Dhabi-Dubai Road, Abu Dhabi |
Chief Engineer Town Roads, Abu Dhabi |
69,650,816.00 4-Jul-90 |
100% |
Yes On Time |
30 |
ADM,Abu Dhabi, UAE |
Trip Project 14A Sh.Khalifa Bin Shakhbut St., Al Nahayan St.(South), Abu Dhabi |
De Leuw Cather International, Abu Dhabi |
113,813,800.00 13-Oct-90 |
100% |
Yes On Time |
31 |
Public Works Department P.O.Box 3, Abu Dhabi |
Sulaymat Interchange Tuwayah Bridge Project, Al Ain |
Italconsult, Abu Dhabi |
50,334,780.00
13-Feb-90 |
100% |
Yes On Time |
32 |
Al Ain Municipality, Al Ain, UAE |
New Service Road & Parking for Government Complex in Al Ain |
STUP International PO Box 7034, Dubai, UAE |
26,408,442.00
14-Feb-90 |
100% |
Yes On Time |
33 |
ADM,Abu Dhabi, UAE |
Trip Project 17/17A Combined - King Khalid Bin Abdul Aziz St. Manhal/ Abu Dhabi |
De Leuw Cather International, Abu Dhabi |
105,971,664.00 31-Dec-91 |
100% |
Yes On Time |
34 |
ADM,Abu Dhabi, UAE |
TRIP Project Supply, Laying, Installation & Maintenance of Telephone Cables affected by TRIP/17/17A |
De Leuw Cather International, Abu Dhabi |
7,476,178.00 1-May-91 |
100% |
Yes On Time |
35 |
ADM,Abu Dhabi, UAE |
Road & Parking for New Jazira Hotel - Ghantoot / Abu Dhabi |
Roads & Traffic Engineers, Abu Dhabi |
7,732,510.00 1-May-91 |
100% |
Yes On Time |
36 |
Public Works Department P.O.Box 3, Abu Dhabi |
Construction, Paving Completion & Maintenanace of Ghantoot Road, Abu Dhabi |
Freeman Fox International Ltd, Abu Dhabi |
53,328,269.00 25-Aug-91 |
100% |
Yes On Time |
37 |
Al Ain Municipality, Al Ain, UAE |
Two Bridges on Al Ain-Dubai Road(Al Oha & Masheeq Area)-Al Ain |
Italconsult, Abu Dhabi |
30,204,453.00 2-Nov-91 |
100% |
Yes On Time |
38 |
Public Works Department P.O.Box 3, Abu Dhabi |
Samha Interchange |
Italconsult, Abu Dhabi |
17,980,211.00 30-Oct-91 |
100% |
Yes On Time |
39 |
Al Ain Municipality, Al Ain, UAE |
Repair & Resurfacing Roads in Al Ain City, Al Ain |
Italconsult, Abu Dhabi |
14,554,011.00 14-Sep-91 |
100% |
Yes On Time |
40 |
ADM,Abu Dhabi, UAE |
Baniyas Town Road Sector EB1/03-04 |
Italconsult, Abu Dhabi |
52,358,218.00 31-Jul-92 |
100% |
Yes On Time |
41 |
ADM,Abu Dhabi, UAE |
TRIP Project 77 Eastern Ring Road (North)-Abu Dhabi, UAE |
De Leuw Cather International, Abu Dhabi |
127,281,805.00 31-May-94 |
100% |
Yes On Time |
42 |
Al Ain Municipality, Al Ain, UAE |
Roads & Parking at Jabel Al Nagfa & Other areas of Al Ain Town Centre, Al Ain |
Shankland Cox(UAE) P.O.Box 80670, Al Ain, UAE |
12,474,477.00 30-Apr-94 |
100% |
Yes On Time |
43 |
Al Ain Municipality, Al Ain, UAE |
Stage 12 - Roads in Al Ain City, Al Ain |
Italconsult, Abu Dhabi |
34,479,646.00 30-Apr-92 |
100% |
Yes On Time |
44 |
Al Ain Municipality, Al Ain, UAE |
Project for the Development of Old & New Sanaiya and the construction of Bridge across the wadi/Al Ain, UAE |
Freeman Fox International Ltd, Abu Dhabi |
159,799,111.00 31-May-95 |
100% |
Yes On Time |
45 |
ADM,Abu Dhabi, UAE |
TRIP Project 23 Saeed Bin Tahnoon St., Abu Dhabi |
De Leuw Cather International, Abu Dhabi |
82,382,636.00 15-Jun-95 |
100% |
Yes On Time |
46 |
Public Works Department P.O.Box 3, Abu Dhabi |
Abu Dhabi Equestrian Center Tracks, Renovation Works, Abu Dhabi |
Team Consult P.O.Box 70228, Abu Dhabi |
15,941,286.00 11-Oct-96 |
100% |
Yes On Time |
47 |
Public Works Department P.O.Box 3, Abu Dhabi |
Abu Dhabi-Al Ain Expressway Contract No.1, Abu Dhabi |
Italconsult, Abu Dhabi |
258,390,656.00 4-Jan-95 |
100% |
Yes On Time |
48 |
Sh. Khalifa Committee, Abu Dhabi |
Khaledya Co-operative Society Building, Abu Dhabi |
Planner, P.O.Box 7890, Abu Dhabi |
19,824,480.00 1-Jun-96 |
100% |
Yes On Time |
49 |
Sh. Khalifa Committee, Abu Dhabi |
Khalil Khalid Al Mureikhi Building, Abu Dhabi |
Sayed Khalaf, Abu Dhabi |
22,633,429.00 5-Feb-95 |
100% |
Yes On Time |
50 |
Abu Dhabi Defence Force, Abu Dhabi |
Main Contractor Al Zareefi Co. P.O.Box 19413, Al Ain Asphalt Works - Construction, Completion and maintenance of approach Road to villa and stables at Al Wathba, Abu Dhabi |
Abu Dhabi Defence Force, Abu Dhabi |
1,759,964.00 Oct-96 |
100% |
Yes On Time |
51 |
ADNOC/GASCO |
Client - ADNOC/GASCO Contractor: TDC,Dykerhoff & Widmann AG Abu Dhabi Branch, Abu Dhabi, UAE Laying of Asphalt Concrete Roads within the new LPG Tankage project No. 1209-LAD |
ADNOC, Abu Dhabi |
1,000,000.00 10-Oct-97 |
100% |
Yes On Time |
52 |
ADM,Abu Dhabi, UAE |
TRIP Project 35 Tourist Club Area-South, Abu Dhabi, UAE Work Inside Navy Compound (Utility Ducts, Storm Water System, Kerbs Asphalt) |
De Leuw Cather International, Abu Dhabi |
107,870,381.00 4,200,000.00 30-Jun-97 |
100% |
Yes On Time |
53 |
Public Works Department P.O.Box 3, Abu Dhabi |
Tarif-Jabal Dhanna Road Rehabilitation of Second Carriage way, Abu Dhabi |
Consult Ltd. P.O.Box 53, Abu Dhabi |
53,851,527.00 15-Mar-98 |
100% |
Yes On Time |
54 |
ADM,Abu Dhabi, UAE |
Abu Dhabi TRIP Contract W28 Sheikh Sultan Bin Khalifa Palace Road Project, Sector W-28 |
De Leuw Cather International, Abu Dhabi |
13,533,608.00 30-Nov-99 |
100% |
Yes On Time |
55 |
Public Works Department P.O.Box 3, Abu Dhabi |
Mafraq - Tarif Road Rehabilitation of Second Carriageway, Abu Dhabi |
Consult Ltd. P.O.Box 53, Abu Dhabi |
60,553,456.00 15-Jul-98 |
100% |
Yes On Time |
56 |
Public Works Department P.O.Box 3, Abu Dhabi |
Construction of Second Carriageway and Rehabilitation of the existing Sweihan Al Saad Road with relocation of Service Line stage I (Ch. 1+000 to Ch. 16+350) |
DIWI Consult (Emirates) P.O.Box 4515, Abu Dhabi |
67,698,546.00 5-Jul-99 |
100% |
Yes On Time |
57 |
Public Works Department P.O.Box 3, Abu Dhabi |
Construction of Second Carriageway and Rehabilitation of the existing Sweihan Al Saad Road with relocation of Service Line stage I (Ch. 16+350 to Ch. 31+375) |
DIWI Consult (Emirates) P.O.Box 4515, Abu Dhabi |
65,706,458.00 5-Jul-99 |
100% |
Yes On Time |
58 |
Public Works Department P.O.Box 3, Abu Dhabi |
Internal Roads for 80 New Low Cost Houses at Al Shawamekh City - Contract No. 2* (* Addendum No.2-PW/29.10.98) |
Frederic R. Harris, Inc P.O.Box 44296 Abu Dhabi, UAE |
26,332,178.00 19-Apr-99 |
100% |
Yes On Time |
59 |
Public Works Department P.O.Box 3, Abu Dhabi |
Internal Roads and Services for 30 Low Cost Houses at Sweihan (Village) |
DIWI Consult (Emirates) P.O.Box 4515, Abu Dhabi |
16,568,851.00 5-Jun-99 |
100% |
Yes On Time |
60 |
ADM,Abu Dhabi, UAE |
Contract 950 - Sector Roads E30,E31,E34/01,E34/02,E35,E26,E28,E29 & E39 |
Sir Alexander GIBB P.O.Box 4515, Abu Dhabi, UAE |
74,856,242.00 1-Feb-00 |
100% |
Yes On Time |
61 |
Public Works Department P.O.Box 3, Abu Dhabi |
Construction of Internal Roads for New Low Cost Houses at Shawamekh City - Contract 3 |
Frederic R. Harris, Inc P.O.Box 44296 Abu Dhabi, UAE |
91,787,915.00 17-Nov-99 |
100% |
Yes On Time |
62 |
Public Works Department P.O.Box 3, Abu Dhabi |
General Hospital at Al Rahba Project Al Mureikhy Contracting (Main Contractor) RAPCO (Sub Contractor) |
Belgian Arab Consultant Bureau |
4,973,446.00 31-Dec-99 |
100% |
Yes On Time |
63 |
Public Works Department P.O.Box 3, Abu Dhabi |
Construction of Internal Roads for New Low Cost Houses at Shawamekh City - Contract 4 |
Frederic R. Harris, Inc P.O.Box 44296 Abu Dhabi, UAE |
35,991,436.00 11-Mar-01 |
100% |
Yes On Time |
64 |
Public Works Department P.O.Box 3, Abu Dhabi |
Construction of New Truck Road from Al Faya to She Sheib - Contract 3 (KM 48+500 - KM 67+000) |
Rendel Palmere & Triton, Abu Dhabi |
68,034,252.00 26-Jun-01 |
100% |
Yes On Time |
65 |
Abu Dhabi Aviation, P.O.Box 2723, Abu Dhabi |
Asphalt Work/Drainage of the areas around apron at Abu Dhabi International Airport |
Abu Dhabi Aviation, P.O.Box 2723, Abu Dhabi |
865,150.00 7-Oct-01 |
100% |
Yes On Time |
66 |
Works Department P.O.Box 3, Abu Dhabi |
Construction and Maintenance of Internal Roads and Services for the New Housing at Abu Dhabi - Contract 3 East of Shawamekh City |
Hyder Consultant, P.O.Box 2774, Abu Dhabi |
37,672,033.00 30-Jun-02 |
100% |
Yes On Time |
67 |
Works Department P.O.Box 3, Abu Dhabi |
The New Road Tarif - Madinet Zayed - Liwa Contract 2B (Associated with Bridge Works) |
Ove Arup & Partners, Abu Dhabi |
77,669,874.00 29-Dec-02 |
100% |
Yes On Time |
68 |
GASCO, P.O.Box 665, Abu Dhabi |
Repair of Asphalt Roads at Habshan Gas Plant |
GASCO, P.O.Box 665, Abu Dhabi |
3,036,675.00 30-May-03 |
100% |
Yes On Time |
69 |
Works Department P.O.Box 3, Abu Dhabi |
Construction of Internal Roads for New Low Cost Houses at Shawamekh City - Contract 6 |
Frederic R. Harris, Inc P.O.Box 44296 Abu Dhabi, UAE |
70,000,000.00 19-Feb-03 |
100% |
Yes On Time |
70 |
Works Department P.O.Box 3, Abu Dhabi |
Improvement and Reinforcement of Existing Road At Madinet Zayed - Contract 2 |
Frederic R. Harris, Inc P.O.Box 44296 Abu Dhabi, UAE |
74,498,005.00 30-Jun-03 |
100% |
Yes On Time |
|
TOTAL AMOUNT |
3,064,340,551.00 |
DHS |
|
|
|
|
|